Participation in more than 150 works in Spain, Portugal, Italy, Morocco, Honduras and Algeria. Among the most important works are:
· High speed train tunnels in Guadarrama, Spain. Length 2 x 28 km: fire extinction system design.
· Distribution center for Logista at Leganés (Madrid), warehouse area 23.000 m², office 4.000 m²: electrical / lighting, emergency power generation and IT cabling projects.
· Distribution center for Riofisa at San Agustín de Guadalix (Madrid), warehouse area 15.000 m², office 400 m²: projects of electrical / lighting, IT cabling, fire protection, HVAC and plumbing systems design.
· Distribution center for Cecauto at San Boi del Vallés (Barcelona), warehouse area 5.000 m², office 1.700 m²: electrical / lighting, IT cabling, fire protection, HVAC and plumbing systems design.
· Industrial area (200.000 m²) for Redur at Algete (Madrid): fire protection system design; electrical infrastructure for the first phase.
· Distribution center (22.900 m²) and office (800 m²) for Redur at Algete (Madrid): fire protection system design.
· Industrial building for DAF at Algete (Madrid), 6.100 m²: electrical / lighting, IT cabling, fire protection, HVAC and plumbing systems design.
· Distribution center at Getafe (Madrid), warehouse area 5.200 m², office 1.200 m²: electrical system design.
· Distribution center at Martorelles (Barcelona), warehouse area 24.500 m², office 3.200 m²: electrical system design.
· El Viso residential area, Argés (Toledo), 117.000 m²: project for new street lighting.
· Transport interchange hub at Plaza Elíptica, Madrid, 23.000 m²: HVAC project review.
· Advice for the redaction of the mandatory technical requirements for HVAC systems of transport facilities owned by the Consorcio de Transportes de Madrid.
· Crushing, conveying and sizing mining machinery design for Trame and Canteras El Sierro.
· White marble micronizer plant at Macael (Almería), capacity 100.000 Tm/year: preliminary design.
· Leather curing facility at Huecas (Toledo), area 750 m²: industrial building and services project.
· Sludge drying plant in 775.000 m³/day flow waste water treatment plant at Milan (Italy): collaboration in design.
· Process water recycling plant for gravel pit at Peñas de San Pedro (Albacete), flow 50 m³/h: design.
· Containers sea port at Puerto Cortés (Honduras): review of the port services project; preparation of the technical offer for its construction
Other works:
· Sea water desalination plant at Adeje and Arona (Tenerife), flow 10.000 m³/day: assembling and installations project management. Done in SPA (FCC group).
· Oily waste water treatment plant in the Candelaria fuel power plant (Tenerife, Spain): project management and commissioning. Done in SPA (FCC group).
· Valdecañas hydroelectric power plant, 225 MW: maintenance works. Done in NIP.
· Cofrentes nuclear power plant: maintenance and project improvements implementation. Done in NIP.